Construction Begins - 2023

Our journey with the remodel and addition to the Junior-Senior High and New Tennis Courts began in September 2023. Renderings of the new front and entrance was a big hit with the students and the New Tennis Courts were complete in time to host the District 20 2A Tennis Tournament on April 22nd and 23rd of 2024!

People look at displays in a hallway with wooden accents.

Checking out the renderings for the remodel and construction - September 2023

A group of people examines a poster in a hallway.

Pointing out details in the new drawings - September 2023

Students look over a drawing of a new building in front of a display case.

Getting a better look - September 2023

New building drawing featuring a new entrance.

Proposed look for remodel of Centerville Junior-Senior High - September 2023

New building drawing showing new front entrance with steps

The new entrance - September 2023

Overhead view of four tennis courts, two on each side, with blue playing surfaces.
Construction site illuminated at dusk, with heavy machinery visible.

The nighttime pour for the New Tennis Courts was nearing completion just before sunrise on November 28, 2023.

The sun is just visible above low clouds early in the morning over newly poured concrete on a construction site with heavy equipment and lighting.

Concrete is poured! November 28, 2023

Aerial view of two tennis courts with blue surfaces and white lines.

An aerial shot of the newly constructed tennis courts. January 2024

An elevated view of tennis courts with spectators watching a doubles tennis match.

District 20 2A Tennis Tournament - April 23, 2024

May 2024 through September 2024

Construction of the New Addition began with a Groundbreaking Ceremony on May 20, 2024.

After the demolition of the old tennis courts, the dirt work began and over the next several months, the new addition started to take shape.

A group of people in hard hats stand with shovels at a groundbreaking ceremony.

Administrators and School Board Members attend the Groundbreaking May 20, 2024 (From Left to Right): Dottie Sullivan, Carole Dickey, Terry Largent, Charles Nash, Tuffy Loftin, and Trampas Rodell.

A group of people stand together outdoors, holding shovels.

Faculty and staff joined members of the CISD Board of Trustees and Administration to celebrate the groundbreaking on the new addition and renovations for the Junior-Senior High. May 20, 2024

A wide shot of a construction site under a bright blue sky.

The awning, sidewalk and planter boxes between the Main Building and Annex have been removed. May 28, 2024

A building sits on a grassy area under a partly cloudy sky and pieces of a demolished sidewalk lay in the foreground.

Sidewalk removal - May 28, 2024

Construction site with dirt mounds, yellow posts, and a vehicle in the background.

Only a small section of the old awning and sidewalk remain in front of the Main Building. June 3, 2024

Construction site with piles of dirt and building materials under a cloudy sky.

The demolition of the old tennis courts has begun. June 3, 2024

A series of images showing a construction site with dirt and a blue sky.

The dirt work continues and lines are being installed. June 13, 2024

An aerial view shows a construction site with building materials and equipment.

An aerial view of the beginning of the dirt work for the New Addition. June 2024

Aerial view of a complex of buildings with reflective roofs.

An aerial shot of the campus showing the new addition site. July 2, 2024

Aerial view of a complex of buildings with light-colored roofs.

Another aerial shot of the new addition from the west side of the campus. It also shows the start of the back hallway on the Main Building as well as the forms for the new connecting hallway leading to the Cafeteria from the Main Building. July 2, 2024

Construction workers are seen near a building and a trench.

Rebar and forms are in for the back hallway behind the Main Building. July 2024

A close-up view of a brown, textured surface, possibly soil or mulch.

Concrete is poured for the back hallway. July 2024

A collage of images showing a construction site with earthworks and a concrete mixer.
An aerial view shows a construction site with several buildings and dirt roads.

An aerial shot of the rebar and forms for the New Addition. August 2024

Construction workers install insulation on a building foundation.

The rebar is in and we were just waiting on favorable weather for concrete! August 30, 2024

Construction site with a building under renovation, featuring concrete block walls.

The wall is going up for the back hallway. September 2024

Aerial view of a school campus with a track, field, and tennis courts.

An aerial shot of the completed tennis courts and the campus. September 2024

Overhead view of a courtyard with white walls and a small green area.

Aerial view of the new hallway that connects the Main Building and Cafeteria. September 2024

An aerial view of a brightly lit concrete pour on new building.

The concrete pour begins! September 6, 2024

A concrete pump pours concrete onto a building foundation on a construction site.

More of the concrete pour. September 6, 2024

A construction site with a partially built structure under a cloudy sky.

The first part of the addition foundation is in! September 6, 2024

A concrete pathway leads through a construction site under a bright blue sky.

Lots of activity this week! The back sidewalks have been poured and walls are starting to go up. We also have plumbing starting to go in. September 16, 2024

Construction site with concrete foundations and walls under a blue sky.

A shot from the back of the New Addition. The back sidewalk is almost complete and the walls are going up! September 16, 2024

A grassy field leads to a building and some structures in the distance.

The rest of the awning and sidewalk have been demolished in front of the Main Building. They are preparing to construct the forms for concrete in front of the building. September 27, 2024

October 2024 through December 2024

The walls began going up and October saw the New Addition start to really take shape. Our Fellowship of Christian Students blessed the new building by writing scripture on one of the trusses. And by December, the brick work was beginning!

A long, brick building stretches across the image under a blue sky.

Getting ready for the next concrete pour. The wall beside the Main Building is starting to go up. October 2024

An outdoor patio area with a wooden picnic table and overhead shade.

New connecting hallway to the Cafeteria. October 2024

Aerial view of a construction site with buildings and equipment.

Next phase of concrete foundation pour for the New Addition. October 2024

Aerial view of a construction site with exposed earth and building foundations.

Next phase of concrete foundation pour for the New Addition. October 2024

Aerial view of a construction site with buildings and paved areas.

Next phase of concrete foundation pour for the New Addition. October 2024

Aerial view of a building under construction, showing the framework and surrounding area.

Aerial view of the latest section of foundation for the New Addition. October 2024

A concrete building under construction on a sunny day.

The first of the walls for the new addition is coming along nicely! October 7, 2024

Construction site with concrete structures under a clear blue sky.

More New Addition walls going up! October 2024

Construction site with stacked building materials and scaffolding under a blue sky.

More walls going up! October 7, 2024

A construction site with a small excavator under a blue sky.

The concrete forms are almost ready to start on the very front portion of the foundation. October 7, 2024

A nighttime view of a construction project with rebar and concrete forms.

The last pour for the new addition to connect to the Annex. October 2024

A group of people stand together outdoors on a sunny day.

Fellowship of Christian Students were joined by CISD Administration and Board of Trustee members to write scripture on one of the trusses for the new addition. October 22, 2024

More photos from this day are in the Truss Scripture Day section below.

Construction workers are seen on a building site under a bright blue sky.

New front entrance is going up! October 21, 2024

A low-angle view of a metal structure against a cloudy sky.

New addition. October 2024

Construction site with concrete block walls and scaffolding.

New addition entrance. October 2024

A building under construction with exposed concrete walls and a clear blue sky.

New addition. October 2024

Interior view of a building under construction, showing concrete block walls.

New addition main hallway leading to front entrance. October 2024

A large building under construction with a light-colored facade.

The new entrance is up! It's really starting to look different! Some roof supports are in along the back and they are putting in the framing for the front entrance steps. November 1, 2024

A person walks through a concrete hallway with sunlight streaming in.

New Addition back hallway. November 2024

An interior shot of a block structure with vertical supports and a high ceiling.

New addition roof supports are in. November 2024

A modern school under construction with exposed concrete and dark siding.

The back entrance is up! November 4, 2024

An open doorway reveals an interior space with a red tub and shovel.

A side hallway of the new addition. November 4, 2024

A building under construction with concrete block walls.

Part of the sidewalk and ramp down from the main entrance are in. More rebar is in for concrete. November 4, 2024

A construction crane extends over a building under construction against a blue sky.

Roof supports are being installed with a crane on the main hallway of the new addition. November 14, 2024

A building with a dark roof is seen against a cloudy sky.

Scaffolding is up in various areas to start the brick work! December 5, 2025

An aerial view of a building under construction showing exposed roof supports and concrete block front.

Most of the roof supports are up along with the supports for the awnings at the front and side entrance. December 2024

An aerial view shows a large building under construction with a modern design.

Another shot showing the progress made on the New Addition. December 2024

An aerial view shows a complex of buildings with flat roofs.

Another aerial picture showing the progress made on the roof. December 2024

A building under construction with exposed framing and a dirt road in front.

Brick work on the front of the building begins! December 2024

Construction site with partially built buildings under a clear blue sky.

Brick work begins on the back of the building. December 2024

A building under construction with a covered entrance and multiple windows.

The brick work on the front entrance is almost complete! December 2025

Truss Signature Photos - October 22, 2024

Group of students with metal truss they wrote scriptures on for the new building

Fellowship of Christian Students - October 22, 2024

Truss Scriptures

Scripture on metal truss
Scripture on metal truss
FCS members write scripture on metal truss for new building
Scripture on metal truss
Scripture on metal truss
FCS members write scripture on metal truss for new building
Scripture on metal truss
Scripture on metal truss
Writing scripture on metal truss
Scripture on metal truss
Scripture on metal truss
Writing scripture on metal truss for new building
Scripture on metal truss
Scripture on metal truss
Writing scripture on metal truss
Scripture on metal truss
Scripture on metal truss
Students writing scripture on metal truss for new building
Scripture on metal truss
Scripture on metal truss
Students writing scripture on metal truss for new building
Scripture on metal truss
Students writing scripture on metal truss for new building
Scripture on metal truss
Scripture on metal truss
Students writing scripture on metal truss for new building
Scripture on metal truss
Scripture on metal truss
Students writing scripture on metal truss for new building
Scripture on metal truss
Students writing scripture on metal truss for new building
Students writing scripture on metal truss for new building
Students writing scripture on metal truss for new building
Students writing scripture on metal truss for new building
Students writing scripture on metal truss for new building

January 2025 through June 2025

We came back from the Christmas Break to find a lot has been happening! Brick work was almost complete on the New Addition and construction on the Cafeteria expansion had begun. By April, almost all the brick was up on the front of the building. On the last day of school in May, everyone had moved out of the Annex and Main Building to clear the way for renovations. During June, they began to work on the driveways and upper parking lot.

A tan building with dark rectangular windows against a cloudy sky.

Brick is up on the back of the New Addition. January 16, 2025

Exterior view of a building with a light brown upper section and a darker brown lower section.

Another area of the New Addition completed brick work. January 2025

An empty room with exposed ceiling and bright overhead lights.

A first look inside one of the classrooms in the New Addition. January 2025

A long hallway with white walls and a concrete floor.

The back hallway is coming along nicely. January 2025

Exterior view of a building with a ramp leading to the entrance.

The new handrail is installed on the walkway between the Main Building and Junior High Gym. January 16, 2025

A building with a large glass entrance and a light-colored exterior.

Construction has begun on the extension of the Cafeteria. January 16, 2025

A construction site with rebar and concrete forms beside a building.

Concrete forms and rebar are installed for the Cafeteria expansion. February 2025

Construction workers smoothing fresh concrete on a sunny day.

The concrete pour for the Cafeteria expansion has begun! February 2025

A small, light-colored building with a gabled roof under an overcast sky.

The new steps and sidewalk for the Cafeteria have been poured. The forms for the connecting sidewalk are being installed. April 29, 2025

A group of buildings are seen in the distance, with a grassy area in the foreground.

The brick work on the front of the building is almost complete! April 29, 2025

A building with scaffolding and a car parked nearby.

The brick is going up on the expansion to the Cafeteria! April 29, 2025

A building with a covered walkway supported by columns.

Front bricking and covered side entrance. May 2025

A building under construction with a covered entrance and multiple windows.

New Entrance with brick work complete. May 2025

A stone building with a covered patio and stairs under a cloudy sky.

Bricking complete on the new front entrance. May 2025

An empty office space with bright overhead lighting and neutral-colored walls.

A classroom in the New Addition is almost complete! May 2025

A building with a light-colored exterior stands under a bright blue sky.

The brick work on the back of the Cafeteria expansion is complete. June 2, 2025

A modern library interior with bookshelves and a curved reception desk.

The new library is coming along nicely! May 2025

An empty, well-lit room with beige walls and a light-colored floor.

Classrooms in the New Addition ready to be furnished! May 2025

A large building with a light-colored facade sits on a grassy lawn.

The drives and upper parking lot are being repaved! June 19, 2025

A tree-lined road curves through a green space under a blue sky.

More of the drive repair. June 19, 2025

A tall crane extends towards the sky near a building under construction.

They are placing HVAC units with a crane today. June 19, 2025

A low, tan building sits under a bright blue sky with fluffy clouds.

The outside walls of the Cafeteria expansion are complete. June 19, 2025

A low, tan building with a green lawn and blue sky.

Fresh sod has been laid along the back of the New Addition. It's really looking nice! June 19, 2025

A sunny day view of a building with a grassy courtyard.

Windows and doors are all installed for the back entry. June 19, 2025

A renovation project with duct work hanging from and exposed ceiling and exposed wall joists.

Renovations begin in the Cafeteria. June 2025

An empty room with a checkered floor and red accents, possibly under renovation.

The Main Building renovations have started! June 2025

A long, well-lit hallway with white walls and a tiled floor.

Part of the back hallway. June 2025

A long, brightly lit hallway with doors on the right side.

The main hallway is almost ready! June 2025

An empty library or office space with computers and desks.

We just need furniture for the library to be complete! June 2025

A long, well-lit hallway with doors on the left side.

The hallway leading to the Administration and District offices. June 2025